Composite plate tile press splitter or splitter installation method splitter or block installation method refers to the grid frame into strip or block units respectively from the lifting equipment lifted to the height of the design position in place, and then into a whole installation method.

Installation method of compound plate tile press

Composite plate tile press splitter or splitter installation method splitter or block installation method refers to the grid frame into strip or block units respectively from the lifting equipment lifted to the height of the design position in place, and then into a whole installation method.

The strip is divided into several sections along the long span direction of the grid frame. The width of each section can be from one grid to three grids, and the length is the span of the short span of the grid frame. Blocky refers to the rectangular or square shape of the unit divided along the vertical and horizontal direction of the network frame. The weight of each unit of composite plate tile press is subject to the lifting capacity of existing lifting equipment on site.

Most of the welding and splicing work of the splicing or splicing method of the composite plate tile press is carried out on the ground, which is conducive to improving the engineering quality and saving most of the assembling supports. As the division of single at the time has considered the existing capacity of lifting equipment on the site, can make full use of the existing equipment on the site, reduce the rental cost of lifting equipment.

There are two kinds of high-altitude bulk method of composite plate tile press: full bracket method and cantilever method. The whole bracket method is mostly used for assembling parts, while the overhanging method is mostly used for assembling small units at high altitude. As the pieces are assembled at high altitude, large lifting equipment is not needed, but a large number of foot materials are needed due to the installation of large-scale assembling brackets.